
Rosebud
Mine, Colstrip, MT.
|

k/b equivalent to 1 m of dry
concrete
Retains 96% of gas pressure
after 15 h storage.
|
Pressure
Vessel
V = 3.5 x 107 m3
A = 2.9 x 106 m2
M = 6.1 x 107 t
P = 4.3 x 105 Pa
Pressurizing
Layer
VPL = 3.9 x 107 m3
APL = 3.3 x 106 m2
MPL = 6.9 x 107 t
Whole
Device
VT = 7.4 x 107 m3
Amap = 1.6 x 106 m2
MT = 1.3 x 108 t
Assume
ρ = 1.75 t∙m-3
ϕ = 0.3 scalar
|
Energy
Storage Capacity
CAES 9.0 x 105 kW∙h 0.03% of US need
H2 1.4 x 107 kW∙h 0.47% of US need
Tesla
Powerwalls (13.5
kW∙h at $5500 each)
CAES 67k at $366M
H2 1.1M at $5.8B
|